CCPRO

Wednesday, 24.04.2024, 13:56

Welcome Guest | RSS

RUSSIAN RUSSIAN VERSION VERSION

English Russian Translation Services About UsRegistrationLogin
Site working-days
Map of visits
Site menu
3D Cloud tags
Bookmark for site

If you want to add this page to socially mark, click on this button. In the appearing window, locate and click «None», then select the social network and in the upper right corner click «Submit».

Search
Site friends
  • Create your own site
  • Statistics

    Total online: 1
    Guests: 1
    Users: 0
    Block title
    gages - english russian translate matter of safety photohelic switch - english russian translate intelisys-english russian translate professional translation engine-english russian translate turbocharged engines 1300 series automatic voltage regulator avr-english russian translate technical documentation technical documents fault finding for stamford ac ac generator gen - english russian translate battery electric forklift truck multipurpose forklift truck bypass valve valve - english russian translate intake air systems piston type accumulator twin screw pump chain hoist hoist - english russian translate cuttings re-Injection fabric expansion goints controller MCS II thyristor power controller inlet casing Compressor combustor turbine cylinder exhaust diffuser exhaust manifold british standard 5486-12:1989 bs 5486-12:1989 british standard 3135:1989 bs 3135:1989 european standard PrEN 15038:2006(E european directive - atex 94/9/ec
    Russian Translation Services » About Us

    CCPRO Ltd (the complete name "CENTER OF CERTIFICATION PRO") as certification body has appeared in 10/9/2001 and in 12/6/2001 the first certificate for "Wilhelm Kaimann GmbH and Co", Hovelhof, Germany and then certificates have been issued for "VALBIA Srl", Brozzo - Brescia - Italia; "SEITRON Srl", Bassano del Grappa (VI) - Italia; "Lurgi Lentjes AG", Dusseldorf, Germany, "SIEMENS AG", Offenbach, Germany; "TROGES Gesellschaft fur Trocknungs- und Warmetechnik", Wien, Austria; "Slovenske Energeticke Strojarne a.s.", Tlmace, Slovenska Republika.

    But unexpectedly Cabinet Council of Ukraine has made changes to the decree which has actually forbidden to non-state organizations to perform works on voluntary certification (in a zone which is not regulated by the state).

    During that moment Ltd CCPRO participated in Starobeshevo Power Plant modernization project with Circulating Fluidized Bed Boiler for unit No. 4 in Ukraine performing works on certification of some kinds of the equipment. Instead of equipment certification CCPRO Ltd has started to execute translation, preparation and making the basic operational documentation in PDF format for 4th unit Starobeshevo Power Plant (it is rather more than 7 000 pages and drawings).

    At the moment CCPRO Ltd participates in construction project Combined Cycle Power Plant on OJSC Alchevsk Iron and Steel Works in Ukraine (translation from English into Russian, pages makeup and making the operation & maintenance manual in PDF format of the CCPP - it is rather more than 10 000 pages and drawings).

    Recently CCPRO Ltd has performed works on Sakhalin II Project PA-B Platform (drilling motors produced Parkwood Circle Drive, pigging gathering systems with pig launchers and receivers produced SWECO FAB INC, drill cuttings re-injection system produced M-I SWACO).

     

    Before the creation Mr. Molodets Sergey as an the expert of The State Committee of Health and Safety at Work of Ukraine has executed conformity assessment of the following equipment manufacturers of European Union:

     

    "Promishlena energetika Varna AD", Varna, Bulgaria

    February 1999;

    "O. S. Panto Srl", San Polo di Piave TV, Italy

    September 2001;

    "Max Weishaupt GmbH", Schwendi, Germany

    February 2000;

    "TECE GmbH and Co.", Emsdetten, Germany

    December 2001;

    "Joh. Vaillant GmbH and Co", Remscheid, Germany

    September 2000;

    "JENBACHER AG", Jenbach, Austria

    March 2002;

    "Slovenske Energeticke Strojarne a.s.", Tlmace, Slovenska Republika

     October-November 2000;

    "GARIONI NAVAL Srl", Castelmella (Brescia), Italia

    June 2002;

    "Compania Roca Radiadores SA (boilers)", Barcelona, Spain

    March 2001;

    "Bertrams Heatec AG", Muttenz, Switzerland and Schmehmann - Ebener and "Rohrverformungstechnik GmbH", Bad Marienberg, Germany

    November 2002;

    "KORTING HANNOVER AG", Hannover, Germany

    May 2001;

    "ELCO Klockner Heiztechnik GmbH", Pirna, Germany

    December 2002.

    Login form
    Tag list
    Calendar
    «  April 2024  »
    SuMoTuWeThFrSa
     123456
    78910111213
    14151617181920
    21222324252627
    282930
    Site friends
  • Create your own site
  • Map of visits
    Copyright CCPRO Ltd © 2024

    Free article submission AllofMaine.com   Website Monitoring by InternetSeer